Here’s a recap of the June 1 meeting of the Design Review Board Urban Panel for the city of Greenville.
Approved with conditions: Greenville Gateway Project
The panel gave final approval on the design of the new Greenville Gateway mixed-use development located on the former Greenville Memorial Auditorium site on North Church Street.
Plans for the project were previously deferred during the DRB’s April meeting to further review and alter the development’s facade details, exterior materials, color selections and more. The panel also suggested a simplification of the development’s design.
The project — named the Gracie Plaza at the Arena District — consists of two interconnected towers featuring:
- 294 residential apartments
- Restaurants and commercial space
- Creative studios
- A parking structure concealed by an elevated terrace
The applicant, Miami-based NR Investments, has worked with Greenville’s Johnson Design Group to design the new development.
Read more on the Greenville Gateway development
The new design of the project was approved with conditions recommended by city staff including a full-scale material mockup for review, exterior lighting to be further reviewed, etc.
The panel also suggested further interactions as the project develops, specifically reviewing the eastern facade of the north tower.
Approved with conditions: Greenville Summit expansion

The panel unanimously approved the proposed expansion of the Greenville Summit located 201 W. Washington St. in downtown Greenville.
The project consists of a new eight-story addition to the site which will create 50 new affordable senior housing apartments.
Built on the site of the property’s current parking lot, the expansion will connect to the existing building and feature a new outdoor courtyard between the two buildings. The new building was designed in tight site conditions and will be built right up to the property’s zero lot line.
The architectural materials, pattering and scale of the expansion were inspired by the existing building along with modern design touches.
The project was approved with city staff conditions and panel recommendations to further review the exterior materials and lighting that will be used on the building’s facade.
Approved with conditions: Exterior renovations for Cowboy Up Saloon

The panel unanimously approved the exterior renovations proposed for the Cowboy Up Saloon property in downtown Greenville.
The project will be located at the former Addy’s site at 17 E. Coffee St. — a historic building originally built in 1920.
The exterior renovations to the property include:
- Strip the paint from the facade to restore the historic brick
- Reconfigure the entry door and windows
- Install a metal canopy
- Install a new black blade sign with the Cowboy Up Saloon logo
After review by the panel, the project was approved with the city staff’s recommended conditions including the appropriate treatment methods for the brick, further permits for signage, etc.
Approved with conditions: New Spinx market on South Main Street

The panel unanimously approved the renovation plans for The Spinx Co. to establish a new downtown market at the former The Cook’s Station site.
Located at 659 S. Main St., the renovation plans for the building include adding a new covered patio and a grassed open space.
Read more on Spinx’s new downtown market
The panel had concerns when it came to the proposed design including the pedestrian traffic flow in the front of the building, the ramps located on the building’s exterior, landscaping, etc.
The project was ultimately approved along with city staff comments and conditions proposed by the panel.
