Newest AC Hotel renderings showcase rooftop bar

Plan modifications go before Design Review Board on Oct. 3

0
1293

The most recent renderings of the AC Hotel by Marriott’s rooftop bar have been submitted to the City of Greenville Design Review Board Urban Panel.

The hotel in the Camperdown Development at 305 S. Main St. previously received a certificate of appropriateness and is going back before the DRB for approval on proposed modifications.

Architectural drawings show the dining terrace, the greenhouse, the dining room, and the sculpture garden.

Other modifications for approval include changing a metal panel color; adding covered seating to a previously approved seating area; doing away with a curtain wall system by an express elevator; and adding a sixth-floor catwalk that is required by the elevator manufacturer.

In addition to the 200-room Auro Hotels project, the development from Greenville-based developer Centennial American Properties will include an apartment building, a public plaza, restaurants and retail, and the 17-story mixed-use Falls Tower.