Newest renderings for the AC Hotel submitted to DRB

1616 Views
The newest design of the AC Hotel by Marriott must undergo revisions before receiving final approval

The most recent renderings for the proposed AC Hotel by Marriott in the Camperdown development at 305 S. Main St. have been submitted to the City of Greenville Design Review Board Urban Panel.

The application for a certificate of appropriateness for the Auro Hotels project cites changes to the rooftop feature that was previously approved; additional guest rooms, which result in a change of elevation along Main Street; and changes to the exterior materials.

Architectural drawings show a plaza-level bar, a rooftop bar overlooking Main Street, and the addition of an exterior water wall feature near the entrance.

The DRB Urban Panel meets March 1 to discuss this application. View the agenda and full submission here.

SHARE

Related Articles